Middle Ring Road 2,Kepong flyover and the road below
was closed this morning after cracks appeared on a pillar.
Public saw they are small stones fall from the flyover as
they passing by the road.
This is the third time the 1.7-km MRR2 Kepong
flyover has been closed because of cracks.
It was first closed in August 2004 and
It was first closed in August 2004 and
then for the second time in February 2006 for repairs.
Why such thing can still happened when the government
actually guarantee it was safe?
3 comments:
wow! maybe there's a problem with the engineering.
because the goverment got 'internal' problem...
Geez, if you're going to fix, fix it right!
Post a Comment